Alright, i have been making some progress. Got the overflow in and the sump baffles, and then received the sand and heaters in the mail. So, water went in it tonight. I am going to start testing the water tomorrow so i can keep track of the cycle, and i will be able to finish the plumbing by sunday which is why it is not completely full, as you can tell in the pictures.

Sump baffles. The Fuge on left, return pump area in center, and skimmer section on right.

My Durso Standpipe, all of the plumbing will be 1" and i made this 1 1/4" because that is what i was told to do, lol.

Top of the overflow.

Full tank shot, the water is really foggy though because the sand has not completely settled yet
